RISK ASSESSMENT FOR INSTALLATION OF SPLIT AC UNITS

To download risk assessment for installation of split AC units in editable and free, click on the download link given at the end of this article:

1. Activities

  • Transport of units
  • Installation of Units
  • Transport of Ducting
  • Installation of Ducting
  • Transport of Piping material
  • Piping support work
  • Piping Erection
  • Transport of Insulation
  • Installation of Insulation
  • Use of electrical equipment
  • Use of extension leads
  • Defective equipment
  • Before Starting a Machine
  • Protective Measures against COVID-19

2. Hazard / Hazardous Situation

  • Traffic collision
  • Fall of material
  • Fall of material from Height.
  • Injury from using hack saw cutter etc.
  • Dust, debris and Splinters
  • Trip hazard
  • Fall of men from Ladder/scaffold.
  • Injury from using hack saw, cutter, drilling machine etc.
  • Injury from using drilling machine etc.
  • A traffic collision, fall of material and
  • Material damage
  • Skin Allergy due to the material/chemical/substances in case of rock wool.
  • Electrical shock,
  • Burns and fire
  • Electrical  supply and appliance power pose a tripping  and fall hazard (Cuts / abrasions)
  • Muscular skeletal and other physical injuries)
  • Covid-19

3. Risk Control Measures

  • Conduct PEP talk before loading/unloading.
  • Only inspected vehicles found fit shall be engaged.
  • The Split AC units shall be firmly and safely kept in the transportation vehicle.
  • The Split AC units shall be tightly and safely secured using Nylon ropes while loading in the vehicle.
  • A transportation vehicle/truck with an appropriate platform & foldable side gates shall be engaged to prevent the fall of Split AC units/items.
  • Sufficient workmen / Rigger shall be engaged for unloading of Units.
  • Use of safety helmets, Shoes, Florescent
  • Safety vests and other relevant Personal Protective Equipment (PPE’s) shall be used for all workers/technicians.
  • Tools and materials shall not be scattered around the workplace and shall be neatly stacked in a convenient location.
  • A pre-use check conducted by users
  • All electrical equipment brought on to the site must have been electrically tested.
  • Always make sure that the technicians/workers know how to use the electrical equipment/devices safely.
  • Make sure and practice good housekeeping. Also make sure that there are no trailing electrical cables that can cause physical injuries to people due to trip or fall.
  • If you find any technical fault or damage to the equipment, machinery or device, immediately stop using the equipment. First make maintenance and the proceed to use.
  • Always take a great care while using a Residual Current Device (RCD) between the electrical supply and the equipment and or device, particularly when working outdoors, or within a wet or confined place that could be the dangerous.
  • Appropriate outlets to help the range of equipment and or devices generally used. 
  • Use electrical extension leads and adaptors only if mandatory.
  • Electrical extension lead’s length and rated high enough for this particular job.
  • Always make sure and use electrical cable covers where cables have a trip hazard.
  • Always avoid overload for the adopters and sockets. Use single adaptor for single socket only, electrical adaptors should not be plugged into adaptors
  • Any unsafe electrical items, device or appliance must be removed from use to safeguard and secure the location until started work properly.
  • No one must be permitted to bring them electrical equipment on to the premises
  • unless that equipment has been electrically tested.
  • Observe and check that the machine/appliance is complete, with all safeguards adjusted appropriately and essentially, and free from technical faults/defects. The term safeguarding means and include automatic or manual guards, interlocks, two-hand controls, light guards, etc., 
  • Before installation and adjustment, always make sure that the supplier provides the right and CE mark safeguards.
  • Make sure that the every static machine/appliance has been installed properly and as per provided installation design and is in stable condition.
  • Always make sure that the machine is switched off, isolated or locked-off before taking any action to remove blockages/housekeeping,
  • All working team should be checked for fever and high temperature
  • All team members should be free from cough and breathing issues
  • All team members should be occupied with surgical masks and gloves
  • The working team should be occupied with hand wash and hand sanitisers
  • All working team to be made aware of consequences of Virus infection
  • Immediate medical assistance to be sought in case of facing any above issues

Risk Assessment for Installation of Split AC Units


Download File

Post a Comment