RISK ASSESSMENT FOR DISMEANTLING OF TOWER CRANE

The following is point and text derived and taken from the original and editable file for the Risk Assessment for the tower crane dismantling activity. To download quality occupational, health and safety free documents such as HSE forms, training slides, checklists, risk assessments, health and safety procedures and technical guidelines, facility management related all documents, electrical MEP installations and repair work. HAVC documents etc. QHSE docs are the only site that is providing its visitors with quality and free editable documents. you just download, fill in your details and go for the official use

1-Work Activity

  1. Using Tower Crane, 1 (MR220) to dismantle TC 2 (MC205B)
  2. Dismantle counterweight.
  3. Secure the counterweight (Using a 4-legged chain SWL 3200kg/legged)
  4. Dismantle of main jib section. (In 10 to 15m length)
  5. Secure and install with the Tower Crane. 
  6. Install 2 No’s pivoting pins. (Using 4 wire rope SWL 5000kg/wire rope)
  7. Dismantle the counter jib with winches.  
  8. Disconnect from the tower head. (Using 4 wire rope SWL 5OOOkg/wire rope)
  9. Dismantle of slewing assemble. 
  10. Disconnect 8 No's of Pins (Using 2 wire rope SWL 5000kg/wire rope)
  11. Dismantle of mast section
  12. Secure and lift the mast section into position. 
  13. Disconnect 8 No's pins

2-Hazards

  1. The collapse of Tower Crane Lifting gear failure.
  2. The collapse of Tower Crane Lifting gear failure.
  3. Lifting gear failure
  4. Falling parts from the crane.
  5. Man falling from the height 

3-Existing Control Measures

  1. Briefing for all personnel involved in the operation area must be barricaded and with warning signs and no other activity is allowed.
  2. Tower crane operators, lifting supervisors, riggers and signalers must be approved and qualified personnel.
  3. Strictly follow lite Company work procedure.
  4. Use of safety harnesses with shock absorber.
  5. The operation area must be barricaded with warning signs and no other activity is allowed.
  6. Tower Crane operator, lifting supervisor, riggers and signaler must be approved and qualified personnel.
  7. LS to inspect the LG are in good working condition and with a valid certificate.
  8. Qualified crane personnel to ensure all crane parts are intact and properly Secure before lifting.
  9. Qualified crane personnel are in position and secured.
  10. Using of PPE.

RISK ASSESSMENT FOR TOWER CRANE DISMANTLING